Do we understand the project?
- Team and responsibilities
- Technical requirements
- Timing and key risks
- Supplier feasibility
- Initial validation strategy
A generic learning model for project maturity: each gate asks a different question and requires evidence that the product, process and organization are becoming ready.

Technical specifications, revisions, configuration, interface definition and design evidence.
Risk register, design/process FMEA inputs, mitigation plans and escalation decisions.
Simulation, design validation plan, physical tests, results, deviations and closure.
Process flow, tooling maturity, controls, capability, capacity and manufacturing trials.
Dimensional reports, material evidence, control records, checking aids and PPAP status.
Approved baseline, change requests, impact analysis, application and traceability.
A robust APQP review challenges the evidence behind the rating: What changed? What was measured? Under which configuration? What remains open? What is the risk to the next milestone?