Objective
Stabilize the product architecture and design baseline sufficiently to release detailed engineering and industrial preparation.
Universal gate mapping: Product architecture and design baseline freeze.
- Released product definition, CAD and specifications
- Critical characteristics, interfaces and design risks
Decision and evidence
Record the decision, the evidence reviewed, open risks, action owners and due dates. Do not treat an open issue as closed without documented verification. If a design change is needed, assess product interfaces, manufacturability, validation impact, quality documentation and affected approvals before implementation.
Use applicable APQP planning and production-part approval requirements as relevant to the product, customer and supply chain.